top of page

A Portfolio of Projects Delivered with Safety, Quality, and Precision

Our Projects

MALAMEH AL BENA General Construction Company (MELABCO) provides integrated construction and trading services with a strong focus on the oil and gas sector. All services are executed in strict compliance with client specifications and approved procedures, international construction and oil and gas standards, Health, Safety and Environmental (HSE) requirements, quality control, inspection protocols, and Iraqi regulatory requirements.

MELABCO Malameh Al Bena General Construction & Trading L.L.C Eng. Ihsan Ali Mohaisen ملامح البناء للتجارة والمقاولات العامة ش.م.م مهندس احسان علي محيسن
MELABCO Malameh Al Bena General Construction & Trading L.L.C Eng. Ihsan Ali Mohaisen ملامح البناء للتجارة والمقاولات العامة ش.م.م مهندس احسان علي محيسن
MELABCO Malameh Al Bena General Construction & Trading L.L.C Eng. Ihsan Ali Mohaisen ملامح البناء للتجارة والمقاولات العامة ش.م.م مهندس احسان علي محيسن
MELABCO Malameh Al Bena General Construction & Trading L.L.C Eng. Ihsan Ali Mohaisen ملامح البناء للتجارة والمقاولات العامة ش.م.م مهندس احسان علي محيسن
MELABCO Malameh Al Bena General Construction & Trading L.L.C Eng. Ihsan Ali Mohaisen ملامح البناء للتجارة والمقاولات العامة ش.م.م مهندس احسان علي محيسن

Project Portfolio

  • Erbil–Duhok Natural Gas Pipeline (198 km).

  • Shorsh-Hetit Public Hospital.

  • KRG Water Infrastructure Program (Dams & Networks – completed packages).

  • Iraq Model Schools Program – Phase 1 (1,000 schools, multiple packages).

  • Al-Faw Grand Port – Phase 1 (Five Container Berths & Access Infrastructure).

  • Baghdad–Mosul Highway Rehabilitation (priority sections).

  • Nasiriyah Combined-Cycle Power Plant (Phase Completion).

  • Samawah Gas Power Plant Expansion.

  • Basra Seawater Injection Project (Initial Phases & Infrastructure Packages).

  • Mosul University Reconstruction Program.

  • Baghdad Ring Road – Southern Section (Phase Completion).

  • Karbala Water Supply Strategic Project.

  • Maysan Gas Power Plant Expansion.

  • Rehabilitation of Roads to Halfaya Oil Filed.

  • Civil work and Waste Treatment Container Building.

  • Rehabilitation of Ali Al Garbi Entrance

  • Rehabilitation of Roads to Halfaya Oil Filed 

  • Civil work and Waste Treatment Container Building 

bottom of page